The door is up and it works!
George, hear are a few pics you asked about"
Here is the connection of the overhead frame to the truss.

Trolley track

Installing lift cables

5 Gal buckets of gravel to keep cables snug

Getting ready to lift into place

Lifted about 2 feet and checked that everything was happy.

Side supports are in place and the door is being lowered into the "closed: position

Trolley and chains are attached to the top of the door

First time!

DONE!!!
There is still a fair bit of work to do. The sheeting is only attached at the edges and needs to be finished. I still need to run the welds on the back of the door that was against the floor during assembly. I have to measure and buy trim and flashing to finish the outside of the opening.
I have to do a bit of tweaking as the wheels that guide the sides are free at the bottom of the travel but bind a bit at the top. I also will work on leveling the door at the full open position. A quick measure tonight showed 10'4" of clearance. That's about what I expected and is limited by he existing height of the barn.
The door is a bit lighter than Georges and it will not close all the way by gravity alone. I have to pull on the bottom half. The resistance is from the weather stripping but that may not be a bad thing.
I have and extra 6 feet of cable that was used to raise the door from the floor. I may need to remove the excess as the wraps are getting into each other on the pipe when the door approaches full open.
The only big disappointment so far is that I missed lining up the door sheeting ridges with the existing sheeting above the door. I thought I measured it correctly but missed by about 1.5 inches. Oh well.
I hope to get the plane into the hangar tomorrow. I'll post that final pic soon. Cheers.